Cape Henry Associates (CHA), contracted by Eastern Shipbuilding as the Lead System Integrator for the Full Mission Bridge Simulator installation at the Whitehall Ferry Terminal in Manhattan, New York, is pleased to announce that testing is underway.

CHA has been diligently working in support of this contract with KOVA Global and Wartsila for the benefit of the Staten Island Ferry service, which runs between Whitehall Street in lower Manhattan and the St. George Ferry Terminal on Staten Island. The ferry service carries the second largest number of passengers annually in the United States – roughly 22 million – on the 5.2-mile, 25-minute trip.